top of page
Construction

Apple Store TI, Surrey

Client | Local General Contractor

Location | Mall in Surrey, BC

Project Type | Commercial – Mall Tenant Improvement (TI)

Size | 11,500 sq. ft.

Features | HVAC installation including VRF System

​

Mechanical System Details

  • Water Source Heat Pump: Custom distribution ductwork was installed to provide both heating and cooling to the space.

  • VRF System: Multiple VRF condensing units were connected to ducted air handling units and ceiling cassettes to provide additional coverage throughout the space.

  • Energy Recovery Ventilators (ERVs): ERVs were implemented to introduce fresh air into the space while recovering energy from the air being exhausted.

​​

This engineered project was successfully executed through meticulous planning and coordination by our operations team. Integrating a complex VRF system into an active retail environment was no small feat and required a diligent approach to minimize disruptions. The majority of the work was completed after hours to avoid impacting the client’s day-to-day operations—while still maintaining the high quality and attention to detail that VRF installations demand.

​

Working closely with the design team, we identified substantial cost-saving opportunities to help keep the project on budget and on schedule. Material handling, delivery scheduling, site setup, and daily tear-downs were all carefully coordinated to ensure the client’s business remained uninterrupted—effectively delivering a mechanical refresh behind the scenes.​

bottom of page